Rubber running track for jogging park | jogging track material | jogging track flooring
Rubber running track for jogging park | jogging track material | jogging track flooring
RUBBER JOGGING TRCK
The prefabricated rubber running track has a flat structure. It contains a friction surface layer, a shock-absorbing bottom layer, and an adhesive layer arranged between the shock-absorbing bottom layer and the foundation.
Its shock-absorbing bottom layer is a solid, flat-structured plate, which can completely bond the shock-absorbing bottom layer and the foundation, and the bonding surface is 100%. Therefore, in addition to the functions of the traditional prefabricated rubber jogging track, it can also prevent the volatile components enclosed in the shock-absorbing layer. It can effectively prevent bulging and delamination during use. In this way, the maintenance of the prefabricated rubber jogging track can be reduced, and the service life will be longer.
The jogging track is made of natural rubber that have passed environmental labeling product certification. The jogging park, a variety of sports, leisure and entertainment activities are integrated with the beautiful natural environment, providing citizens with a place that integrates leisure, fitness, and strolling functions.
DETAILS
DIFFERENT THICKNESS
VARIOUS COLORS
BETTER PERFORMENCES
SIZE
APPLICATION
INSTALLATION
1. The foundation should be smooth enough and without sand. Grinding and leveling it. Be sure it does not exceed±3mm when measured by 3m straightedges.
2. Follow the daily construction plan to place the prefabricated rubber running track in the designated location. Draw the baseline according to the provided drawing.
3. Stir the adhesive thoroughly to ensure a consistent mixture before application. Use the prepared adhesive within one hour to maintain its effectiveness.
4. Take the stirred adhesive to the required area and evenly spread it over 2-3 meters using toothed scrapers to ensure consistent and uniform coverage.
5. Place the rubber roll materials in the fixed position, carefully unfold them, and align them precisely to ensure a proper connection with the adhesive.
6. Use a special trowel to forcefully flatten the running track surfaces. Eliminate the air bubbles remaining in the bonding process of the roll and the base.
7. The gap should be securely sealed with nails to ensure stability, prevent movement, and maintain a seamless, durable, and professional finish.
8. After being fixed with nails, press the area with bricks to ensure better connection and enhanced adhesion, allowing the adhesive to set properly.
9. Clear the athletics track of any debris, dirt, and foreign objects to create a clean and safe surface. This ensures proper performance and longevity of the track.
10. After completing the installation, inspect the entire field to ensure all gaps are filled with adhesive and smoothed. Finally, clean the entire field thoroughly and ensure it is kept clean.
11. Mark the lines accurately according to the provided drawings, ensuring correct alignment and measurements for a precise and professional finish.
12. Extend the straight track line, and then mark the lane numbers clearly on the running track for easy identification, visibility, and accurate use.
VEDIO
Packaging And Shipping
Certificates
EXHIBITION
HOW TO MAKE THE ORDER?
- Provide free plan according to your site drawings
- Provide free samples
- Free installation video is provided after the order is placed
- Provide site installation services
- Cost calculation
- Start production after receipt and payment (provide a video of the production process)
Get In Touch
- *Name
- *Tel
- *Title
- *Content